imported_d00t
New member
Before:
After (half the hood only):
Total working time so far is 9 hours.. about 4.5 in the wash (took rims off to get inside the barrels), 1 in claying, and the rest testing combos, and starting finishing off half the hood, and starting on the rest of it.
C&C Welcome!
:wavey



After (half the hood only):


Total working time so far is 9 hours.. about 4.5 in the wash (took rims off to get inside the barrels), 1 in claying, and the rest testing combos, and starting finishing off half the hood, and starting on the rest of it.
C&C Welcome!
:wavey